![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-2.jpg&w=3840&q=75)
Customized Solution
- Forell | Elsesser provided structural engineering services for the adaptive re-use of the Levi Strauss Factory Building at 250 Valencia Street in San Francisco, which was originally constructed in 1906 and is recognized by the San Francisco Planning Commission as a Structure of Merit. The adaptive re-use of this building from a manufacturing building to a private K-8 school was achieved with a seismic retrofit and renovation.
- The existing, 87,000 s.f. heavy-timber structure was laterally reinforced with steel braced frames and collectors. The existing brick footings were replaced with a concrete mat slab and grade beams.
- Project challenges include maintaining the historical integrity of the building while adding structural elements and working with many unforeseen existing conditions.
- The renovated facility includes classrooms, offices, large conference and meeting rooms, parking, and a gymnasium enclosed with new steel roof trusses and metal deck.
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-4.jpg&w=3840&q=75)
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-3.jpg&w=3840&q=75)
Highlights
- Architect: Pfau Long Architecture/Page & Turnbull Architects, General Contractor: Plant Construction
- Owner: San Francisco Friends School
- Heavy timber structure reinforced with steel braced frames, collectors, and existing brick footings replaced with a concrete mat slab and grade beams.
- Sustainable features including building and material re-use, thermal towers, and radiant floors resulted in a 2009 Savings by Design Award of Merit.
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-6.jpg&w=3840&q=75)
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-5.jpg&w=3840&q=75)
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-4.jpg&w=3840&q=75)
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-3.jpg&w=3840&q=75)
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-2.jpg&w=3840&q=75)
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2Fsf-friends-school-1-PRIMARY.jpg&w=3840&q=75)
Team
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2FMasume-Dana-1.jpg&w=1920&q=75)
Masume Mansouri Dana
Principal
![San Francisco Friends School Seismic Retrofit](/_next/image?url=https%3A%2F%2Fapi.forell.com%2Fwp-content%2Fuploads%2FSusan-LaFore-1.jpg&w=1920&q=75)
Susan LaFore
Associate