Forell Elsesser provided structural engineering services for the tenant improvement of Floors 27 to 30 at 350 Mission in San Francisco. The project included build out of conference rooms on Floor 27, an Executive Briefing Center on Floors 28 & 29 including video walls and a café/bar, and a Garden Level for entertaining on Floor 30. All four levels are connected with an exposed custom steel-framed stair with glass security gates.
Team
Allen Nudel
Director of Business Strategy
Geoff Bomba
Director of Engineering Operations