Projects

Pixar Animation Studios’ Film Production Facility
How do you create an inspiring modern building within an industrial neighborhood?
Categories
Pixar Animation Studios’ Film Production Facility

Customized Solution

  • This new 155,000 s.f. state-of-the-art office and production facility includes offices, an espresso bar, fireplace and lounge, 125-person theater, one 60-person screening room, editing suites, story and art rooms, meeting rooms and game areas. Designed using Building Information Modeling, the concrete framed structure is 3-stories with concrete shear walls that act as the lateral protection system.
  • The building design utilized nonlinear response history analysis including soil-structure interaction effects to optimize the proportioning of lateral elements and to reduce foundation construction costs.
  • The building was detailed to emulate the appearance of the existing neighborhood structures, including board-formed exposed concrete surfaces and hand-laid brick finishes.
Pixar Animation Studios’ Film Production Facility

Highlights

  • Architect: Allied Works Architecture, Inc. / Perkins + Will
  • Owner: Pixar Animation Studios
  • Concrete framed with concrete shear walls
  • LEED Silver Certification
Pixar Animation Studios’ Film Production Facility
Pixar Animation Studios’ Film Production Facility
Pixar Animation Studios’ Film Production Facility

Team

Pixar Animation Studios’ Film Production Facility

Russell Berkowitz

Principal

Pixar Animation Studios’ Film Production Facility

Masume Mansouri Dana

Principal

Pixar Animation Studios’ Film Production Facility

Simin Naaseh

Senior Principal

Categories