Forell | Elsesser is currently providing structural engineering services for the new PHCD Senior Living facility which is located in Burlingame and is designated for Assisted Living and Memory Care residents.
Customized Solution
- The building is 6-stories, including 124 units, totaling 150,000 square feet.
- Thin post-tensioned concrete slabs allowed the team to maximize the number of units within the allowable building height.
- Underground parking garage with 44 parking spaces located below the building.
- The new facility is located across the street from Mills-Peninsula Hospital.
Highlights
- Architect: SmithGroupJJR
- Owner: Peninsula Health Care District
- Post-tensioned Concrete Construction
- Underground Parking